Excavation and Trenching Permit
An excavation and trenching permit template is a document to ensure that underground utilities and services are not damaged during excavation or trenching activities. It outlines the requirements and procedures for obtaining a permit, including the need for utility location services and safety measures. The template also includes guidelines for the restoration of disturbed areas and the reporting of any incidents or damages.
An excavation and trenching permit template is a document to ensure that underground utilities and services are not damaged during excavation or trenching activities. It outlines the requirements and procedures for obtaining a permit, including the need for utility location services and safety measures. The template also includes guidelines for the restoration of disturbed areas and the reporting of any incidents or damages.
An excavation and trenching permit template is a document to ensure that underground utilities and services are not damaged during excavation or trenching activities. It outlines the requirements and procedures for obtaining a permit, including the need for utility location services and safety measures. The template also includes guidelines for the restoration of disturbed areas and the reporting of any incidents or damages.
What’s Included
1 X Excavation and Trenching Permit template Microsoft Word Document.
What’s Not Included
Ready to use document
Our documents are templates, they need to be populated and altered in order to comply with any legal obligations and/or corporate policies.
Disclaimer
DISCLAIMER: PLEASE NOTE, THE INFORMATION CONTAINED IN THIS DOCUMENT IS GENERAL AND THE CONSULTATION REQUIREMENTS MUST BE INCORPORATED PRIOR TO USE. NONE OF THE AUTHORS, CONTRIBUTORS, ADMINISTRATORS OR ANYONE ELSE CONNECTED WITH THE DEVELOPMENT OF THESE DOCUMENTS, IN ANY WAY WHATSOEVER, CAN BE RESPONSIBLE FOR USE OF THE INFORMATION CONTAINED IN OR LINKED FROM THESE TEMPLATES. PCBU’S MUST CONSULT WITH THEIR WORK CREWS REGARDING THESE WORKS PRIOR TO APPROVING AND IMPLEMENTING THIS DOCUMENT INTO USE, MAKING SITE SPECIFIC ADJUSTMENTS AS REQUIRED.